HOME » Products » MCCB Components » M1E Stainless Steel Contact Spare Parts

M1E Stainless Steel Contact Spare Parts

◆ The copper and iron circuit breaker parts of Yuming Electric have high quality materials, stable quality and fine workmanship.
◆ Yuming Electric Co.,ltd has an advanced R&D centre to improve the technology and design diversified products for stamping parts, integrating design, manufacturing and analysis, and actively engaging in peer and international technology exchange to provide excellent products and manufacturing solutions.
◆ We specialize in producing all kinds of copper and iron parts for circuit breakers and have a complete and scientific quality management system and an advanced mould development department.
Availability:

PDF Export

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button


Product Parameter

Model

PM1-E spare metal parts

Material

Steel/brass/copper

Usage

Automotive, agriculture, furniture, machinery

Power

Terminal

Part type

Stamping part

Specification

Customized

Colour

White/ bright/ grey/ dark/ grey/ black

Delivery

7~30days

MOQ(pcs)

5000

Warranty

2 years

Transport package

Carton/pallet

Fire rating

Flame retartant /Non flame retartant

Service

OEM/ ODM

Origin

Wenzhou, Zhejiang, China

Shipping

By sea, air, road and express

Production capacity

5000PCS per week

Export Markets

Global


Features

If an exceeded level is detected, the protection and control equipment can regulate the voltage or current, or switch off the power supply to protect the load from damage.

Process: mold design,drilling, tapping, heat treatment, laser cutting, mold assembly, stamping, bend, welding, powder treatment, film thickness inspection, packing.

100% inspection before delivery.

Most of the production is automated, which reduces costs.


FAQ

Q:How is your shipment term?
A:For goods less than 100kg, we suggest express or air freight; for goods more than 100kg, we suggest sea freight.


Q:How about your production time?

A:We will provide samples to the customer for approval based on drawings and then arrange production and confirm delivery dates based on purchase orders. Usually, the production lead time is 5-30 days, depending on the structure of the component. If there is an urgent request, please communicate with us and we will arrange to increase the workload.


Q: Do you provide service of OEM?

A:Yes, we have experienced engineers, mould makers, designers and production line worker.


Previous: 
Next: 
  • Subscribe to Our Newsletter​​​​​​​

  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
Leave a Message
Contact Us